How we work
Most steel jobs follow the same path: we find out what you need, get or check the drawings, quote, make it in our workshop in Drogheda and fit it. Here is what happens at each step and what you can do to speed it up.

How it works
- 1. Tell us about the job. Send photographs, rough sizes, drawings if you have them, and where the site is. For bigger or more complex jobs we come out and measure.
- 2. Drawings and calculations. Structural steel is made to an engineer's design. If you have drawings, we work from them. If you do not, we work with engineers and designers who can produce them.
- 3. Quote. You get a written quotation for the job as drawn, with what is and is not included.
- 4. Fabrication to EN 1090 EXC2. The steel is cut, drilled, welded and finished in our workshop in Drogheda under our EN 1090 Factory Production Control, certified up to Execution Class 2.
- 5. Delivery and fitting. We deliver the steel and our team installs it, or we supply it to your builder.
- 6. Paperwork. At the end you get the paperwork that applies to the job, such as the Declaration of Performance and material certificates.
Who designs and who builds
TopTac is a fabricator and installer. For anything structural, such as beams, frames, mezzanines and balconies, an engineer designs it and we make and fit it to that design. For non-structural work like gates, railings and brackets, we can often work from your sizes and a sketch.
We do not give planning, legal or engineering advice. We can tell you what information the engineer or the council is likely to ask for, and we work with engineers and designers so the drawings suit fabrication.
What to send us first
- Photographs of the area, including access for delivery.
- Sizes, even rough ones, or drawings.
- What it is for, and any finish you want: primed, painted, galvanised or powder coated.
- Your timing, and whether the steel is to be supplied only or supplied and fitted.
Why drawings matter
A clear drawing with sizes, material, sections and connections lets us price accurately and avoid extras. For structural steel, the engineer's drawings and specification also set the Execution Class and the finish, which decide how the steel is made and inspected. See EN 1090 explained.
Finishes
Steel for inside a dry building is often supplied primed, ready for a fire protection or paint system if one is specified. Steel for outside is usually hot-dip galvanised, and can then be painted or powder coated. Tell us where the steel will be and we will confirm the finish your engineer or specification asks for.
On site
Before we fit, we agree access, lifting and any temporary works with you or your builder. For beams in houses, the builder normally props the structure before the wall comes out, as the engineer specifies. We check sizes on site before final fabrication where the job depends on existing walls or levels.
Note
General information, not legal or engineering advice. Check with your engineer, architect or local authority.
Ready to start?
Send photographs, sizes or drawings and we will tell you what we need next.
Common questions
Do I need drawings before I contact you?
Do you work outside Louth?
Ready to start?
Send photographs, sizes or drawings and we will tell you what we need next.
