Steel mezzanine floors: what to know before you build

A mezzanine adds floor space inside a building you already have. In Ireland, adding floor space to a shop, office, factory or warehouse can bring in building control certificates, so it pays to know the rules before the steel is priced.

Steel floor framing being erected inside a building by TopTac

Does a mezzanine need a Fire Safety Certificate?

Often, yes. Article 11 of the Building Control Regulations 1997 (as amended) lists the works that need a Fire Safety Certificate. It includes works in connection with the material alteration of a shop, office, or industrial or storage building where additional floor area is being provided within the existing building. A mezzanine adds floor area inside an existing building, so this is usually the first question to ask.

Article 11 also covers new buildings, extensions of more than 25 square metres, material changes of use, and material alterations to buildings such as hotels, places of assembly, shopping centres and buildings containing flats. A Fire Safety Certificate is applied for from the local building control authority, normally by your architect or fire safety consultant.

Disability Access Certificate

Article 20D of the same regulations requires a Disability Access Certificate for the same kind of work: a material alteration of a shop, office, or industrial or storage building where additional floor area is being provided within the existing building, or where the building is being subdivided. This deals with Part M (access and use), for example how people reach the new floor.

Planning permission

Whether planning permission is needed depends on the building, its existing permission and what the mezzanine is for. Using the new floor for a different purpose, or making changes to the outside of the building, can need permission. Ask your local planning authority or your architect before you commit.

The Building Regulations that matter

  • Part A (Structure). Technical Guidance Document A (2012) points to the Eurocodes, including I.S. EN 1991-1-1 for imposed floor loads, I.S. EN 1993 for steel design and I.S. EN 1090 for execution.
  • Part B (Fire safety). Escape routes, travel distances and fire resistance of the structure. Your fire safety designer decides whether the steel needs fire protection.
  • Part K (Stairways, ladders, ramps and guards). TGD K (2014) sets out stair geometry and guarding. Diagram 6 gives guarding heights of 900 mm on stair flights and 1100 mm at landings and the edges of floors in factories, warehouses, offices and public buildings.
  • Part M (Access and use). How people, including people with disabilities, can use the new floor.

Floor loads: storage is not the same as office

The engineer chooses the imposed load from I.S. EN 1991-1-1 and its Irish National Annex, based on what the floor will be used for. Office use, light storage, heavy racking, plant and areas used by forklifts or pallet trucks all fall into different load categories, and storage loads are typically much higher than office loads. Tell the engineer the real use, including what might go on the floor in five years, because the load decides the beam sizes, column sizes and the loads on your existing slab.

Fire protection options

If the fire design calls for the steel to have a fire resistance period, the usual options are intumescent paint, fire-rated boarding around beams and columns, or a fire-rated ceiling under the deck. Which one is right depends on the period required, the look you want and whether the steel will be exposed to knocks. Your fire safety designer specifies it; TopTac can supply the steel primed and ready for the specified system.

What to have ready

  • What the floor is for: storage, office, plant, or a mix, and any racking or equipment that will sit on it.
  • The size you want, the clear height under the mezzanine and the height to the roof or ceiling above.
  • The existing floor: is it a concrete slab, and do you have any details of its thickness or the original drawings?
  • Where the stairs, any gates for loading, and the edges with guarding will go.
  • Photographs of the space, including columns, doors, lights and sprinklers.

What TopTac does

TopTac fabricates and installs steel mezzanine frames, stairs and guarding to an engineer's design, certified to EN 1090 up to Execution Class 2. We do not issue Fire Safety or Disability Access Certificates or give planning advice; we work with the engineers, architects and fire consultants who do. See mezzanine floors and how we work.

Sources and further reading

General information, not legal or engineering advice. Check with your engineer, architect or local authority.

Information checked against the official sources below in November 2026. Rules change, so check the current version.

Next step

Planning a mezzanine?

Send the floor area, what it will carry and any drawings you have.

Questions

Common questions

Does a mezzanine need a Fire Safety Certificate?
Usually, if it is in a shop, office, or industrial or storage building. Article 11 of the Building Control Regulations covers material alterations of those buildings where additional floor area is being provided. Your architect or fire consultant can confirm.
What load should a mezzanine be designed for?
The engineer picks the imposed load from I.S. EN 1991-1-1 and the Irish National Annex based on the use. Storage floors are usually designed for much higher loads than offices, so tell the engineer exactly what the floor will carry.
What height does the guarding need to be?
TGD K Diagram 6 gives 900 mm on stair flights and 1100 mm at landings and floor edges in factories, warehouses, offices and public buildings. Your designer confirms what applies.
Can my existing floor take a mezzanine?
It depends on the slab and the loads. The engineer checks the column loads and base plates against the existing floor. Any information you have about the slab helps.

Planning a mezzanine?

Send the floor area, what it will carry and any drawings you have.

EN 1090 certified for structural steel up to Execution Class 2 (Vinçotte)Made in our workshop in Drogheda, Co. Louth, Ireland