CVRT test centre upgrades before March 2027: what the building needs
From 19 March 2027 every authorised CVR test centre must meet the higher premises and equipment standard set by SI 475/2022. This guide sets out the deadline, the building figures in the RSA guidelines, and where a steel fabricator fits in.

The deadline
The RSA says upgrades to the CVR testing network must be finished by 18 March 2027. From 19 March 2027, all authorised CVR test centres must meet the new, higher standard for premises and equipment. The RSA also notes that some operators have decided not to upgrade and will stop testing after 18 March 2027.
The legal basis is SI 475/2022, which amends the 2013 authorisation regulations. According to the RSA, it removes the special conditions that let some centres operate without a drive-through lane or with a short HCV pit, and it allows dimension tolerances only in very limited circumstances.
The building figures in the RSA guidelines
The detail is in the RSA document "Premises and Equipment Guidelines on the Minimum Requirements for CVR Test Operators", published 29 November 2022. Section 3.1.2 gives these minimum dimensions for new test centres, and for additional lanes at existing centres, authorised after the guidelines were published:
- Internal length of lane: 30 m for an HCV lane, 26 m for an LCV lane.
- Internal width of lane: 7 m HCV, 6 m LCV.
- Inspection pit (HCV only): at least 20 m long excluding steps, 1.0 m to 1.2 m wide at floor level, 1.4 m to 1.6 m deep.
- Entrance and exit doors: 5 m high and 4.25 m wide, for both HCV and LCV lanes.
- Internal headroom clearance: 5 m. The guidelines say headroom in each lane should at least meet the minimum door height.
- Drive-through test lane: required for both HCV and LCV.
Other points that affect the building
The guidelines also cover things your designer will need to plan around. A new centre generally needs at least one HCV lane and one LCV lane. Vehicles must be able to drive in, through the lane and out to the site exit in a forward direction without reversing. A step down at the entrance door is not permitted, and drainage outside the doors should stop water getting into the building.
The test floor must be industrial-grade concrete, finished to a sealed surface. If the test area is attached to another building, it needs a full-height partition from floor to ceiling, built of materials such as blockwork or metal cladding and certified under the Building Control Acts. Customers must have a waiting area with a direct view of the test lanes, plus accessible toilets.
Outside, the guidelines ask for at least 2 HCV parking spaces of 20 m by 4 m, and 3 LCV spaces of 7 m by 3 m, per test lane, subject to planning.
If you are upgrading an existing centre rather than building a new one, check which standard and tolerances apply to you. The RSA published a separate Annex A for renewal applicants. Your designer should read the full 136-page guidelines, not just this summary.
Planning and building control
A new or extended test hall is building work. Talk to your local authority planning department early and leave time for planning permission, Building Regulations compliance and any Fire Safety or Disability Access Certificate that applies. Steel fabrication cannot start until the drawings are approved, so the design and approval stage usually decides whether you make the deadline.
What to have ready
- The site layout, with the vehicle route from the site entrance through the lanes to the exit.
- The number and type of lanes (HCV, LCV) you plan to run.
- Any existing building you want to extend or re-roof, with photographs.
- Your designer or engineer's drawings once you have them.
What TopTac does
TopTac fabricates and erects structural steel frames for buildings, certified to EN 1090 up to Execution Class 2. For a test hall, we build the steel frame to your approved drawings and your engineer's design, sized to the clear heights, spans and door openings the design calls for.
TopTac does not approve test centres and cannot promise RSA approval. That is between the operator and the RSA. If you do not have drawings yet, we work with engineers and designers who can produce them. See how we work and steel buildings.
Sources and further reading
General information, not legal or engineering advice. Check with your engineer, architect or local authority.
Information checked against the official sources below in November 2026. Rules change, so check the current version.
Upgrading a test centre?
Send your drawings, or tell us where the site is and we will arrange a visit.
Common questions
When must the upgrade be finished?
How long does an HCV inspection pit need to be?
What door and headroom sizes do the guidelines give?
Can TopTac guarantee RSA approval?