Steel beams (RSJs) for extensions and open-plan kitchens

Knocking through to an open-plan kitchen or a new extension usually means taking out a load-bearing wall and putting a steel beam in its place. This guide covers who designs it, how the work is done safely, and the Irish planning and building control limits that changed in July 2026.

Red-primed steel frame fitted at the back of a house for an extension, by TopTac

Is the wall load-bearing?

A load-bearing wall carries floors, roof or other walls above it. You cannot tell reliably by tapping it. An engineer looks at which way the joists run, what is above, and how the house was built, and decides. If it is load-bearing, the opening needs a beam designed by the engineer, with calculations.

What the engineer designs

  • The beam section and grade, sized for the loads and the span.
  • The bearings at each end: how far the beam sits on the wall, and the padstone (a concrete or engineering brick block, or a steel plate) that spreads the load.
  • Any columns or posts, and their foundations.
  • Connections, bolts and any splices.
  • Fire protection, if needed.

Temporary support: props and needles

Before a load-bearing wall is removed, what it carries has to be held up. Builders usually use adjustable steel props (often called Acrow props) under the ceiling, and where a wall above needs support, needles: short beams pushed through holes in the wall above the opening and propped on both sides. The props stay until the new beam is in, packed tight on its padstones and the bearings have set. The engineer or the builder should plan this; it is not a job to improvise.

Fire protection of steel in a house (Part B)

TGD B Volume 2 (Dwelling Houses, 2017) Table A1 lists the fire resistance for parts of a house. For a structural frame, beam or column it gives a minimum of R30 (30 minutes loadbearing capacity). In practice, beams in houses are usually boxed in with fire-rated plasterboard or painted with an intumescent coating. Your engineer or designer specifies which.

Planning: the exemption for rear extensions

Class 1 of Schedule 2 to the Planning and Development Regulations 2001 lets you build a rear extension without planning permission, subject to conditions. From 27 July 2026, S.I. No. 338 of 2026 changed those conditions. The main ones now are:

  • Total floor area no more than 45 m², including previous extensions built after 1 October 1964 (it was 40 m²).
  • Above ground level: no more than 12 m² for a terraced or semi-detached house, or 20 m² for a detached house, and at least 2 m from any party boundary.
  • At least 25 m² of private open space must remain.
  • Windows above ground level at least 8 m from the boundary they face (it was 11 m); ground-floor windows at least 1 m.
  • Wall and roof heights limited by the existing house, and the roof not used as a balcony or terrace.

Building control: Commencement Notice and certification

Building work must comply with the Building Regulations whether or not you need planning permission. Under Article 9 of the Building Control Regulations, a Commencement Notice is lodged on the Building Control Management System. Since 27 July 2026, an extension to a dwelling with a total floor area greater than 45 m² needs the full statutory certification (BCAR), with an assigned certifier and builder (S.I. No. 359 of 2026 changed this from 40 m²).

Owners of a single new dwelling or a domestic extension can instead sign a Declaration of Intention to Opt Out of Statutory Certification, but they must still submit plans and particulars showing compliance, and the work must still meet the regulations. Ask your designer which route applies.

What to have ready

  • The engineer's drawings and calculations, or photographs of the wall from both sides and the floor or roof above.
  • The opening width and the ceiling height.
  • How the steel gets in: doors, windows, hallway turns.
  • Your builder's programme, so the beam arrives when the props are up.

What TopTac does

TopTac fabricates beams, columns, plates and connections to the engineer's design in Drogheda, certified to EN 1090 up to Execution Class 2. We can deliver to your builder or install the steel ourselves, and we work with engineers if you do not have one yet. See steel beams.

Sources and further reading

General information, not legal or engineering advice. Check with your engineer, architect or local authority.

Information checked against the official sources below in November 2026. Rules change, so check the current version.

Next step

Opening up a wall?

Send the engineer's drawings, or photographs of the wall and we will tell you what we need.

Questions

Common questions

Do I need an engineer for a steel beam?
Yes, if the wall is load-bearing. The engineer sizes the beam, the bearings and padstones and any fire protection. TopTac fabricates and installs to that design.
How big can a rear extension be without planning permission?
Since 27 July 2026, up to 45 m² in total including earlier extensions after 1 October 1964, subject to the other Class 1 conditions in S.I. No. 338 of 2026. Check with your local authority.
When does an extension need BCAR certification?
Since 27 July 2026, an extension to a dwelling with a total floor area greater than 45 m², unless the owner opts out under Article 9(5) of the Building Control Regulations.
Does the steel beam need fire protection?
TGD B Volume 2 gives a minimum of R30 for a structural beam or column in a dwelling house. It is usually achieved with fire-rated board or intumescent paint, as your designer specifies.

Opening up a wall?

Send the engineer's drawings, or photographs of the wall and we will tell you what we need.

EN 1090 certified for structural steel up to Execution Class 2 (Vinçotte)Made in our workshop in Drogheda, Co. Louth, Ireland
CallRequest a Quote